Coffee time...
Image 9 of 15
The crew takes a well-deserved water break. In another two hours, the ceiling will be completely covered with OSB panels. The mobile device on the right is a panel lifter on which a sheet of OSB is placed and cranked up into position to allow it to be screwed in place. What a handy tool.